Commercial EV charging installation: what to decide before a site survey
Adding chargepoints at a workplace or depot is a site-planning decision as much as an equipment choice. The right brief starts with how vehicles use the premises, where they park and what the organisation expects the charging provision to do. A clear brief helps an installer assess the site and identify questions that need answers before a design or quote can be finalised.
MCN Mechanical & Electrical lists EV charging and solar PV within its energy systems services. This guide is a practical preparation checklist, not a design specification: the final arrangement depends on the property, electrical infrastructure, equipment and applicable requirements.
Start with the vehicles and users
Write down who is expected to use the chargepoints: company fleet drivers, staff, visitors, customers or a mixture. Note the approximate number of vehicles, the times they are normally on site and whether they tend to use the same parking spaces. Separate regular fleet use from occasional visitor charging because the two patterns can produce different requirements.
Describe the outcome you want. Is the first phase intended to serve a small number of pool cars, support a depot fleet or provide staff charging? Is the project replacing existing equipment or starting from scratch? These are planning questions, not assumptions about a particular charger type or charging speed.
Also decide how access should work. Identify whether spaces are allocated, shared or open to visitors, and who should be able to use each point. If users need instructions, a booking process or a way to report a fault, include those operational details in the brief. Confirm any payment, billing, network or software requirements separately with the relevant providers; do not assume these come with the physical installation.
Map parking, routes and constraints
Provide a current site plan or marked-up aerial image showing parking bays, entrances, buildings and likely chargepoint areas. Mark the spaces expected to be used first and any locations that may be considered later. Include one-way traffic routes, turning areas, loading bays, pedestrian routes and accessible parking so the design discussion reflects how the site actually works.
Flag practical constraints: locked areas, restricted working hours, underground or covered parking, busy delivery periods, surface finishes that should be protected, and any known buried services or planned construction. If the site is leased or shared, establish who can approve work and whether a landlord, managing agent or other occupier needs to be involved.
Cable routes and equipment positions need to be assessed on site. Do not assume the nearest wall or parking bay is the most suitable location. Ask the installer to explain any proposed route, how it relates to vehicle movement and pedestrian access, and what information is still needed before the scope can be confirmed.
Gather electrical and project information
Collect available information about the existing electrical supply and distribution equipment, previous electrical surveys, site drawings and any known capacity constraints. The installer can advise what further checks are needed. Do not estimate spare capacity from a visual inspection or an old document without confirming that it relates to the current installation.
For a project with multiple chargepoints, raise the connection question early. Government guidance says businesses and depots considering multiple chargepoints should discuss the project with their network operator to understand how a connection might be delivered. Ask who will coordinate that conversation and what information the network operator requires. The need and timing will depend on the site and proposed installation.
If the project is part of a new build, major renovation or change of use, tell the design team and building control contact early. Approved Document S provides guidance for relevant Part S building regulation requirements in England. Applicability is specific to the building and project; it should be checked with the project’s competent advisers rather than inferred from a general checklist.
Compare proposals on the same basis
When requesting proposals, share the same vehicle assumptions, parking plan, access model, project phasing and known electrical information with each contractor. Ask each to distinguish confirmed scope from assumptions, exclusions and items that need further investigation. This makes it easier to compare like with like.
Useful questions include: what site checks are included; what information is needed from the network operator; which civil or making-good works are included; how the work will be sequenced around site operations; what commissioning records and user information will be provided; and how faults or future changes should be reported. Ask who is responsible for each interface between the installer, equipment supplier, network operator and site team.
Avoid comparing proposals solely by the number of chargepoints or a headline equipment description. The installation route, supply constraints, operational requirements and project responsibilities can materially affect the scope. Ask for clarification where assumptions differ before choosing a preferred option.
Plan for operation and future changes
Name the person or team who will own chargepoint access, user questions and fault reporting after handover. Decide how staff or drivers will learn the site rules and where operating information will be kept. If the site may add vehicles or parking spaces later, say so at the start and ask what provision, if any, can sensibly be considered now. A future phase should be treated as a planning scenario, not a promise that the existing supply or layout can accommodate it.
Keep the site plan, agreed scope, commissioning information, equipment details and any network correspondence together. Record changes to parking or access arrangements that could affect the installation. This gives the facilities or fleet team a clear reference when the site changes or further work is considered.
A concise briefing checklist
Before a survey, gather: the purpose of the project; expected user groups and vehicle patterns; marked parking and traffic plans; preferred access arrangements; known supply information and previous surveys; site restrictions and approval contacts; likely project phases; and questions about connections, commissioning, handover and support. Note what is known and what remains uncertain.
MCN’s energy systems service (https://mcn-solutions.co.uk/mechanical-electrical/services/energy-systems/) lists EV charging and solar PV. To discuss a workplace or depot project, contact MCN (https://mcn-solutions.co.uk/contact/) with the site location, the intended users and any drawings or electrical information available.
Sources
MCN Mechanical & Electrical, EV charging and solar PV (https://mcn-solutions.co.uk/mechanical-electrical/services/energy-systems/) (checked 18 November 2026). - GOV.UK, Connecting electric vehicle chargepoints to the electricity network (https://www.gov.uk/government/publications/connecting-electric-vehicle-chargepoints-to-the-electricity-network/connecting-electric-vehicle-chargepoints-to-the-electricity-network) (checked 18 November 2026). - GOV.UK, Infrastructure for charging electric vehicles: Approved Document S (https://www.gov.uk/government/publications/infrastructure-for-charging-electric-vehicles-approved-document-s) (checked 18 November 2026).
Sources: MCN Mechanical & Electrical — EV charging and solar PV · GOV.UK — Connecting electric vehicle chargepoints to the electricity network · GOV.UK — Infrastructure for charging electric vehicles: Approved Document S