MCNMechanical & Electrical

Healthcare

Sunderland Royal Hospital

Heating infrastructure in a live hospital

Sunderland Royal Hospital

We delivered the full refurbishment of a heating plantroom serving occupied ward blocks within Sunderland Royal Hospital — working within a live clinical environment throughout, with a temporary boiler plant installed to maintain uninterrupted heating and hot water services for the duration.

Scope of Works

Removal of existing boiler plant and primary pipework

Installation of new high-efficiency modular boiler plant

Replacement of primary and secondary pumping systems

Installation of new stainless steel press-fit pipework

Installation of a new common flue system

Upgrade of plantroom controls and BMS interface

Plant & Systems

The installation comprised modular condensing boilers, energy-efficient circulation pumps, and a new control panel integrated with the existing BMS to improve monitoring and operational performance.

Delivery

Works were carried out within a live clinical environment, requiring phased delivery and strict coordination to avoid disruption to critical hospital services. A temporary boiler plant was installed before strip-out commenced to guarantee heating and hot water continuity for ward blocks.

Start a conversation

Discuss your next project.

Systems you can count on, engineers you can trust.

One contact point. The right specialist team.
Talk to us about your project, maintenance or repair needs.

Discuss your project