Power and lighting for the way you work
Plan distribution, small power and lighting around the equipment, work areas and occupancy of your building. For a fit-out or upgrade, identify existing supplies, proposed loads and any equipment that needs continuity during the work.
Coordinate access and shutdowns
Supply available drawings, previous inspection reports and a schedule of operating hours. Agree isolations, access to distribution equipment and the order of work before installation. These details are particularly useful in occupied premises and multi-tenant buildings.
Testing, records and future changes
Include testing, circuit identification, drawings and handover records in the agreed scope. For a fault or maintenance enquiry, describe the symptoms and affected equipment so the team can plan an assessment. Keep capacity for future changes in the discussion from the outset.