Heating, water and ventilation as one package
Bring heating, hot and cold water services and ventilation requirements into the same brief. Describe the spaces being served, occupancy and existing plant, alongside any planned alterations or new-build specifications.
Existing buildings and phased works
For a replacement or refurbishment, identify plant-room access, pipe routes and services that must remain available. Agree the installation sequence, temporary arrangements and commissioning requirements around the building’s operation.
Handover and ongoing care
Set out the records, controls information and maintenance requirements needed by the people running the building. Housing developers can use our plumbing, heating and gas package page for plot schedules, first and second fix, and phased handovers.