Capture the stages that matter
Identify the views, project milestones and duration you want to record. Camera positions need to reflect the full programme, including changes to site height, access and working areas, rather than only the first phase.
Power, connectivity and camera positions
Describe available power and connectivity, mounting locations and access for maintenance. Our northern Scotland case study shows an Evercam installation using solar power and 4G connectivity; the right arrangement for another site depends on its conditions.
Agree access and finished outputs
Set out who needs remote visibility, the required capture period and how footage will be used in progress reports or presentations. Confirm editing, export and ongoing support requirements in the proposal.
